You can construct and toggle a Concrete mixer, on Facilities.
Access
- You can build a Concrete mixer, after you research Cement hydration.
Technology required: | |||
---|---|---|---|
Technology | Requirement | Research cost | |
Cement hydration | invest 150 000 Knowledge in any branch |
Clay | 15 000 |
Book | 20 |
Construction

Example costs: | ||
---|---|---|
Current Concrete mixers |
Brick | Plate |
0 | 1 000 | 200 |
1 | 1 250 | 250 |
2 | 1 562.5 | 312.5 |
3 | 1 953.13 | 390.63 |
... | ... | ... |
n | 1 000 × 1.25n | 200 × 1.25n |
Consumption
- Active Concrete mixers utilise Energy; and consume Mineral, Water and Cement.
You can toggle Concrete mixers, to be active or to stop consumption, with the 'Toggle' button. Active Concrete mixers toggle off and stop production, if you do not have resources to maintain them.
Resources consumed: | |
---|---|
Consumes | Rate |
Mineral | 50 per second |
Water | 10 per second |
Cement | 2 per second |
Energy | 500 KW per hour |
Production
- Active Concrete mixers produce 0.05 Concrete per second.
You can toggle Concrete mixers, to be active or to stop production, with the 'Toggle' button. Active Concrete mixers stop production, if you do not have resources to maintain them.
Resource produced: | |
---|---|
Produces | Rate |
Concrete | 0.05 per second |
- Other factors increment Concrete production
Facilities |
---|
Power plant | Cement kiln | University | Concrete mixer | Tool factory | Barracks |