You can construct and toggle a Cement kiln, on Facilities.
Access
- You can construct a Cement kiln, after you research Pyroprocessing.
- Pyroprocessing has a requirement to access and research.
Technology required: | |||
---|---|---|---|
Technology | Requirement | Research cost | |
Pyroprocessing | 1invest 100 000 Knowledge in any branch |
Mineral | 200 000 |
Clay | 10 000 | ||
Book | 5 | ||
1requires investment in all 3 branches; v0.9.3 beta |
Construction

Example costs: | ||
---|---|---|
Current Cement kilns |
Steel | Plate |
0 | 600 | 200 |
1 | 780 | 260 |
2 | 1014 | 338 |
3 | 1318.2 | 439.4 |
... | ... | ... |
n | 600 × 1.3n | 200 × 1.3n |
Consumption
You can toggle Cement kilns, to be active or to stop consumption, with the 'Toggle' button. Active Cement kilns toggle off and stop production, if you do not have resources to maintain them.
Resources consumed: | |
---|---|
Consumes | Rate |
Mineral | 100 per second |
Clay | 2 per second |
Energy | 300 KW per hour |
Production
- Active Cement kilns produce 0.1 Cement per second.
You can toggle Cement kilns, to be active or to stop production, with the 'Toggle' button. Active Cement kilns stop production, if you do not have resources to maintain them.
Resource produced: | |||
---|---|---|---|
Produces | - | Cement | 0.1 per second |
- Other factors increment Cement production
Facilities |
---|
Power plant | Cement kiln | University | Concrete mixer | Tool factory | Barracks |